Collective Manuals for Highway BridgeConstruction includes eight volumes, respectively as: Basic Operation andTemporary Facilities, Construction Organization Design, Piers and Foundations, BridgeSteel Structure, Beam Bridge, Arch Bridge, Cable-stayed Bridge and SuspensionBridge. The book is one of the volumes titled as Cable-stayed Bridge, witheight chapters: Introduction, Concrete Pylon Construction, Cable Tower Construction,Main Beam Construction, Steel Girder Construction, Protection and Installationof Suspension Cable, Cable-stayed BridgeConstruction Monitoring and SuspensionCable Replacement and Cable Adjustment in Operation. The book is compiled incoordination and synchronization with the prevailing “Technical Specificationsfor Construction of Highway Bridge and Culverts” (JTG/T F50—2011)tocomprehensively represent the overall level and latest technical developmentsof cable-stayed bridge construction in China.
The book can be usedas a reference book forconstructing, detecting and supervising technicalpersonnel of cable-stayed bridge of highway, urban road, forest andfactory/mine road construction, detecting and supervising technical personnelas well as a study book for cable-stayed bridge design and research personneland teachers and students of relevant majors.